Project Name: Nam Mang 1

Installed Capacity: 64 WM

Dam Type: Roller Compacted Concrete Dam (RCC)

Project Progress Achivement of December 2014: 40%

 

Dam Model

 

Map

 

Project Location: Taphabath District, Bolikhamxay Province

General imformation:

- 08/02/2007 MOU signed between GOL and A & C (Far East) Industrial Ltd.

- signed PDA on 04/05/2010

- on 09/01/2013 signed CA and PPA

Technical imformation:

 

​ຂໍ້ມູນພື້ນຖານດ້ານເຕັກນິກ

Main features of the Project

ໜ່ວຍ

Unit

​ຈຳນວນ

Quantity

1. ເນື້ອທີ່ອ່າງຮັບນ້ຳ (Catchment Area)

Km2

620.5

2. ອ່າງເກັບນ້ຳ (Reservoir)

   

- ເນື້ອທີ່ອ່າງກັກເກັບນ້ຳ (Reservoir area)

Km2

0.148

- ປະລິມານນ້ຳຝົນແຕ່ລະປີ

mm

2,600

- ລະດັບ​ນ້ຳປົກກະຕິ (Normal Water Level)

m

260

- ລະດັບ​ນ້ຳຕ່ຳ​ສຸດ (Minimum Water Level)

m

245

- ບໍລິມາດເກັບນ້ຳປົກກະຕິ (Normal Storage Capacity)

MCM

16.52

- ບໍລິມາດນ້ຳທີ່ນຳໃຊ້ (Effective storage)

MCM

10.44

- ນ້ຳໄຫລເຂົ້າອ່າງສະເລັ່ຍຕໍ່​ປີ (Average annual flow)

m3/sec

34.3

- ນ້ຳນອງ (Design flood)

m3/sec

1.25

- ຮອບວຽນຂອງນ້ຳນອງ(Return period)

year

1000

3. ເຂື່ອນ (Dam)

   

- ປະເພດເຂື່ອນ (Dam type)

 

RCC

- ເຂື່ອນມີຄວາມສູງ (Dam height)

m

70

- ຄວາມຍາວຂອງສັນເຂື່ອນ (Crest length)

m

280

- ລະດັບຂອງນ້ຳເຕັມອ່າງ (Full supply level)

masl

305

- ລະດັບຂອງນ້ຳຕ່ຳສຸດ (Minimum Operating Level)

masl

275

4. ອຸໂມງ (Tunnels)

   

- ຄວາມຍາວອຸໂມງອ່ວາຍນ້ຳ (Diversion Tunnel length) 

m

- ຫນ້າຕັດຂອງອຸໂມງອວ່າຍນ້ຳ (DT Diameter)

m

- ອຸໂມງສົ່ງນ້ຳເຂົ້າເຮືອນຈັກ (Headrace Tunnel length)

km

1.5

- ຫນ້າຕັດຂອງອຸໂມງສົ່ງນ້ຳ (HT Diameter)

m

5.ໂຮງໄຟຟ້າ (Power House)

   

- ສະນິດຂອງຫນ່ວຍປັ່ນໄຟ (Type of Turbine)

 

- ຈຳນວນຫນ່ວຍປັ່ນໄຟ (No of units)

Unit

3 x 21.33

- ກຳລັງຕິດຕັ້ງ (Installed Capacity)

MW

64

- ຜະຫລິດໄຟຟ້າສະເລັ່ຍຕໍ່ປີ (Annual Energy generation)

GWh/year

224.8

- Primary Energy

GWh/year

132 ຫາ 199

- Secondary Energy

GWh/year

51 ຫາ 59

- ຄວາມສູງນ້ຳຕົກ (Rated head)

m

86

- ນ້ຳໄຫລຜ່ານກົງຫັນ (Design discharge)

m3/sec

77

6. ລະບົບສາຍສົ່ງ (Transmission line)

   

- ແຮງດັນ (Voltage)

kV

115

- ຄວາມຍາວ (Length)

km

6.64

- ຈຸດເຊື່ອມຕໍ່ (Connecting point)

 

Thabok ST

7. ຕະຫລາດຂາຍໄຟຟ້າ (Power market)

 

EDL

-       ມື້ເປີດດຳເນີນການຄ້າ (COD)

Year

2016

 